洪江水电站总装机22.5 kW,概算总投资为203573万元,工期4年。工程建设于1998年2月进场,计划于1998年12月大江截流,实现湖南省政府、五凌水电开发有限责任公司制定的“当年开工,当年截流”的目标。截至1998年5月,工程建设累计完成投资7000万元,一期围堰、左右岸轮渡码头、110kV 变电站、改线公路已基本完工,三大系统、一期基坑开挖进展顺利,投资得到了较好的控制。
The total installed capacity of Hongjiang Hydropower Station is 22.5 kW, with the estimated total investment of 2.03573 billion yuan and a construction period of 4 years. The construction of the project came into operation in February 1998 and is planned to be closed to the rivers in December 1998 to achieve the goal of “starting construction in the current year and intercepting the current year” promulgated by Hunan Provincial Government and Wuling Hydropower Development Co., Ltd. As of May 1998, a total investment of 70 million yuan has been completed in the project construction. The first cofferdam, the ferry terminals on the left and right banks, the 110 kV substation and the rerouted highway have been basically completed. The excavation of the first phase of the first phase of the three major systems progressed smoothly and the investment was obtained Better control.