论文部分内容阅读
上海地铁1号线区间隧道多过淤泥质软弱含水地层。要在此加固软土层并封水。煤科总院北京建井研究所与上海机施公司合作,在长沙路地铁旁通道采用三重管高压旋喷注浆法进行处理,取得了成功,文中介绍了该种施工技术与施工经验,供设计、施工单位参考。
Shanghai Metro Line 1 tunnel more than silt soft aquifer. Here to reinforce the soft soil and seal water. Coal Institute of Beijing Institute of Well-built Beijing Institute of Technology and the company in cooperation with the Shanghai Metro in the subway next to the use of triple-tube high-pressure jet grouting method for processing and achieved success, this article describes the construction technology and construction experience for Design, construction unit for reference.