施工图是设计部门提出的正式设计图纸,是工程施工的依据,也是编制竣工图的主要依据之一。施工图发出后,有照图施工的,有修改补充的。修改补充的方式一般有两种:一是出修改补充图,二是发设计修改通知单(以下简称通知单)。设计部门对已发出的施工图的局部修改,常常是以第二种方式表达的,因此,通知单就成为施工图的重要补充。在整理档案中,既要遵循施工图和通知单的自然形成规律,维护它们的本来面貌,又要保持它们之间的有机联系,便于利用。我们在整理施工图档案的时候,就把通知单的号码和日期注记于有关图上。为什么要这样做呢?
The construction drawing is an official design drawing put forward by the design department, which is the basis of construction and one of the main bases for compiling the as-built drawing. After the construction drawing is issued, there is a photo construction, there are amendments to add. There are two ways to modify the supplement: one is to modify the supplementary map, and the other is to send the design modification notice (hereinafter referred to as the notice). Local changes to the construction drawings that have been issued by the design department are often expressed in the second way, so the notice becomes an important complement to the construction drawings. In arranging archives, it is necessary to follow the laws of natural formation of construction plans and notices, maintain their original appearance, and maintain the organic connection between them and make them easy to use. When we finished construction drawings file, put the notice number and date on the map. Why do you want to do this?