论文部分内容阅读
在水电站建设中,如何充分利用天然水力资源,合理地开发水能,选择水轮发电机组,这是直接关系到电站建成后经济效果好坏的根本问题。对于无调蓄设施的迳流式水电站,选好装机容量就显得更加重要了。目前,为了解决电力不足问题,在有条件的县、社兴办了农村水电站。在建站的初步设计中,由于所开发的河流缺少实测的水文资料,在水能设计上操算方法不一,成果浮动很大,容易产生容量选择偏大浪费装机或偏小弃水过多等不合理现象。本文介绍一种水能计算
In the construction of hydropower stations, how to make full use of natural water resources, develop water energy rationally and choose hydro-generator units are the fundamental issues that have a direct bearing on the economic performance after the completion of the hydropower station. For non-storage facilities Shuo-flow hydropower station, choose the installed capacity is even more important. At present, in order to solve the problem of insufficient power, rural hydropower stations have been established in qualified counties and counties. In the preliminary design of the station, due to the lack of measured hydrological data in the rivers developed, the methods of calculation in water energy design vary greatly and the results fluctuate greatly. Irrational phenomenon. This article describes a water energy calculation