论文部分内容阅读
龙口电厂万吨级煤炭专用码头是该厂第二期扩建工程的主要配套项目之一,年进煤量约100~150万吨。该工程可行性研究经过省交通规划设计院(主办单位)、海洋局一所、建港工程处、龙口港务局等单位进行了近一年的工作,已编出报告,提请审查。1985年4月12日至14日由省计委在黄县主持了审查会。省、烟台市、黄县各级建设、电力、交通、环保及建行等主管部门,参加可行性研究调研工作的单位,西北电力设计院,海洋学院等单位48名代表参加了这一会议。
Longkou Power Plant 10,000-ton coal terminal is the second phase of the expansion project of the major supporting projects, the annual coal intake of about 100 to 1.5 million tons. The project feasibility study carried out nearly a year of work by the provincial traffic planning and Design Institute (the organizer), a bureau of the Oceanic Administration, the Hong Kong Construction and Construction Commission, the Longkou Port Authority and other units. A report has been compiled and submitted for examination. From April 12 to April 12, 1985, the Provincial Planning Commission presided over the review meeting in Huang County. 48 delegates from the provincial, Yantai and Huangxian authorities at all levels of construction, electric power, transportation, environmental protection and CCB and other units participating in the feasibility study and research as well as Northwest Electric Power Design Institute and Ocean University attended the meeting.