论文部分内容阅读
我们调测工作在一月中旬已告胜利结束,队部在外业组集中期间利用夜晚时间曾多次召开了技术交流会,交流结果收获极大。 1.在上一阶段调测工作中由于大部领组人员和测普工没有一套调测经验,对图的技术设计往往与实际需要产生矛盾,队里第五组与十三组配合担负鄧县新集的一幅象片图调测地形工作,在敷设测站点时产生过密现象,所敷点数达270多点,每点间
Our commissioning work ended in mid-January and the team ended the seminar successfully. During the concentration period of the field group, the team spent a great deal of time in the evening holding the technical exchange meeting, and the exchange result was greatly rewarded. 1. In the previous phase of commissioning work, most of the team members and the Cape did not have a set of commissioning experience. The technical design of the chart usually contradicted the actual needs. The fifth and thirteenth teams in the team were responsible for the commissioning Deng County, a new set of map-like map of the topography of the work of surveying and mapping in the laying of the site when the phenomenon of over-density, the application of points over 270 points, each point