为从攀枝花选矿厂的磁选尾矿中综合回收钛铁矿及钴镍硫化物,年产五万吨钛精矿的试验性的生产厂—攀矿选钛厂,于1978年7月1日破土动工,至1979年年底基本建成。 选钛厂设计选用的综合回收流程是:强磁选—重选—硫化物浮选—电选联合流程。设计规定日产含TiO_2 46~48%的钛精矿151.68吨,付产含Co0.3%的硫钴精矿19.44吨,钛精矿生产成本103元/吨 (投资修改后成本)。
In order to comprehensively recover the ilmenite and cobalt-nickel sulfide from the magnetic separation tailings of Panzhihua Concentrator, the pilot production plant - the plutonium-bearing titanium concentrator plant with an annual output of 50,000 tons of titanium concentrate was set up on July 1, 1978 Ground breaking started to basically completed by the end of 1979. Titanium plant selection of the comprehensive design of the recycling process is: strong magnetic separation - re-election - sulfide flotation - electricity combined process. It is designed to produce 151.68 tons of titanium concentrates containing 46% ~ 48% of TiO_2 per day, 19.44 tons of sulfur-cobalt concentrates containing 0.3% Co, and 103 yuan / ton of titanium concentrate (modified after investment).