北京东方广场结构形式复杂 ,标高变化多 ,单层面积大 ,板内开洞多 ,施工工期紧。工程全面应用预应力技术 ,解决了结构受力问题 ,并尝试解决了有关温度应力和构造方面的问题 ,应用了无粘结、有粘结两种预应力技术。本文介绍东方广场工程中预应力施工的几点作法。1应用特点本工?
The structure of Beijing Oriental Plaza is complex, with many changes in elevation, large single-layer area, and many holes in the slab. The construction period is tight. The full application of prestressing technology in the project solved the problem of structural stress, and tried to solve the problems related to temperature stress and construction. Two kinds of prestressing techniques, non-adhesive and bonded, were applied. This article describes several practices for prestressed construction in the Oriental Plaza project. 1 Application characteristics of this work?