小山水电站大坝面板混凝土施工时采用了滑模施工,积累了丰富的工程经验,鉴于 此,小山水电站溢洪道陡槽段底板混凝土,亦采用滑模施工,不仅减少了施工临时工作量、 加快了施工速度,又提高了混凝土质量。
In view of this, the concrete of the Xiaoshan Hydropower Station dam concrete slab construction using slip-form construction has accumulated rich experience in engineering. In view of this, the construction of the floor slab in the spillway chute section of Xiaoshan Hydropower Station also uses sliding mode construction, which not only reduces the temporary workload and accelerates the construction Speed, but also improve the quality of concrete.