论文部分内容阅读
攀矿公司为恢复因堆积采选废弃物而破坏的生态决定在兰尖矿采场边坡、朱矿排土场、选矿厂尾矿坝开展植被试验工作.经过1986年三个多月的努力第一批试种任务已基本完成.据统计,在排土场种植大叶桉1223株复盖面积约一万多平方米,成活率为100%;在尾矿坝移栽宽叶铁限草1000m~2,成活率为75%,移栽剑麻40株,成活率为100%;在采矿场边坡撒山毛豆种籽1.5kg,面积为600m~2.目前这些植物长势良好,如能安全渡过明年旱季的难关,就可以保活了.
In order to recover the ecological damage caused by the piling and picking of wastes, the climbing company carried out vegetation testing work at the slope of Lanjian Mine, the dumping site of Zhuji Mine and the tailings dam of the concentrator. After more than three months of hard work in 1986, The first batch of test tasks has been basically completed.According to statistics, 1223 strains of eucalyptus urophylla planted in the dump site covers an area of about 10,000 square meters with a survival rate of 100% 1000m ~ 2, the survival rate of 75%, 40 sisal transplanting, the survival rate was 100%; in the mining slope Soybean germination 1.5kg, an area of 600m ~ 2. At present, these plants grow well, Safely through the difficult dry season next year, you can keep alive.