在原《珠江流域西江水系柳江综合规划修编报告(送审稿)》(中水珠江规划勘测设计有限公司,2009年8月)中,洋溪至从江河段开发方案推荐采用洋溪一级开发方案,即洋溪正常蓄水位为176 m,正常蓄水位与从江梯级发电尾水基本衔接,能同时满足防洪、航运、发电等综合利用要求。但经调查复核发现,洋溪正常蓄水位176m方案淹没较大,正常淹没人口达到1.5万,正常淹没耕地达到1.06万亩(约706.67公顷),故洋溪工程实施难度较大,但降低洋溪正常蓄水位,洋溪库尾至从江梯级河段又较难通过航道整治来满足航运要求。因此,对洋溪至从江河段的开发方案进行了初步补充研究,建议将此段洋溪一级开发方案调整为洋溪、梅林二级开发方案。
In the original “Pearl River Basin Xijiang River Liujiang comprehensive planning revision report (draft for review)” (Zhongshui Pearl River Planning Survey and Design Co., Ltd., August 2009), Yangxi River section from the river development program recommended the development of a foreign level The scheme, that is, Yangxi normal water level is 176 m, and the normal water level basically connects with the tail water of the Congjiang cascade power generation, which can simultaneously meet the requirements of flood control, shipping, power generation and other comprehensive utilization. However, after investigation and verification, it was found that the normal water level 176m of Yangxi was inundated extensively, the normal submerged population reached 15,000 and the normal submerged cultivated land reached 10,600 mu (about 706.67 hectares) The normal water storage level of the river and the tail of Yangxi reservoir to the river reach are more difficult to meet the shipping requirements through waterway regulation. Therefore, a preliminary supplementary study on the development scheme of Yangxi-Congjiang River section is proposed, and it is suggested that the first-stage development plan of Yangxi be adjusted to the second-stage development plan of Yangxi and Merlin.