论文部分内容阅读
文章重点介绍了英国西海岸铁路干线道床捣固施工的组织和作业过程。它是利用保证线路上部结构几何参数绝对值的工艺方法对高速客运线路进行强化整治计划的一个组成部分。
This article highlights the organization and operation of the ballast tamping of the West Coast railroad in the United Kingdom. It is an integral part of the plan to enhance the control of high-speed passenger lines using a process that ensures the absolute value of the geometric parameters of the superstructure of the line.