论文部分内容阅读
1设计前期1.1需求定位智能化小区明确需求定位。根据不同的需求程度,结合项目的特点进行侧重设计。1.2与其它专业设计的衔接1.2.1与电气专业的衔接(1)根据工程的规模及特点,结合以往项目实例,估算消控(监控)机房配电容量,由电气专业设计配合预留配电容量,要求双电源末端切换。(2)设计前期与各相关运营商沟通后,估算通信机房配电容量,由电气专业设计配合预留配电容量,要求双电源末端切换。(3)设计前期与广电部门沟通
1 design early 1.1 demand positioning Intelligent Community Clear demand positioning. According to the different needs, combined with the characteristics of the project to focus on the design. 1.2 Interface with other professional design 1.2.1 Interface with electrical profession (1) According to the scale and characteristics of the project, combined with the past project examples, to estimate the power distribution capacity of the control room (monitoring), by the electrical design and reserve power distribution Capacity, requires dual power end switch. (2) After communicating with relevant operators in the pre-design stage, estimate the distribution capacity of communication room, which is designed by the electrical profession in cooperation with the reserved distribution capacity, and requires the switch of the dual power terminals. (3) pre-design and broadcasting departments to communicate