论文部分内容阅读
利用已建水库建设抽水蓄能电站要搞好统一规划、综合协调,要研究合理的补偿措施和做好水库调度确保电站正常运行.在水库调度中要研究水头保证率和蓄能电站出力受阻机率与受阻程度,水源条件应能确保蓄能电站的正常运行,要特别重视水库在枯水期的运行方式,要在水库中保留发电专用水量,并估计因此产生的对水库其它供水任务的不利影响,明确分析在特枯水年份蓄能发电与水库供水矛盾的集中程度,并研究相应情况的处理措施,以确保蓄能电站的正常运行.
To build a pumped storage power station by using built reservoirs, it is necessary to do well in unified planning, comprehensive coordination, proper compensation measures and reservoir scheduling to ensure the normal operation of power plants. In the reservoir scheduling to study the head guarantee rate and storage power station output impeding probability and obstruction, water conditions should be able to ensure the normal operation of the storage power plant, we should pay special attention to the operation of the reservoir in dry season, to retain the power generation in the reservoir of water And estimate the unfavorable influence on other water supply tasks of the reservoir so as to clearly analyze the concentration of power generation and reservoir water supply during the dry year and to study the corresponding measures to ensure the normal operation of energy storage plants.