基建科研铁基87—2现场制作先张梁工艺设备、铁基86—6张拉应力自动控制及铁基(先)86—14现场制作先张梁工艺设备应用项目评审会,于1990年4月24~26日在邯郸铁三局六处召开。由铁道部建设司主持,参加会议的有21个单位48名代表。邯郸市科委朱主任和建委黄主任电出席了会议。会议认为铁三局为适应现场制梁,减少运输,降低成本作了大量工作,在总结各厂经验的基础上,提出了钢管混凝土台座方案,其构思新颖,有独到之处:1.压柱体积减小,
Infrastructure research and development of iron-based 87-2 field production of pre-Zhang Liang process equipment, iron-based 86-6 tensile stress control and iron-based (first) 86-14 on-site production of pre-Zhang Liang process equipment application project review meeting, in 1990 4 On the 24th to the 26th of the month, it will be held at the sixth place of the Third Railway Bureau. It was chaired by the Ministry of Railways Construction Department and there were 48 representatives from 21 units participating in the meeting. Zhu Zhushi, Director of the Science and Technology Commission of Handan City, and Director Huang of the Construction Commission attended the meeting. The meeting held that the Trilateral Bureau has done a lot of work to adapt to on-site beam making, reduce transportation, and reduce costs. Based on the experience of each plant, the steel tube concrete pedestal plan was proposed. The concept is novel and unique: 1. Columns The volume is reduced,