A new improved algorithm of histogram equalization was discussed and actualized by analyzing the traditional algorithm. This improved algorithm has better effec
Gonghe bridge is a double level cable-stayed concrete bridge with a single-cable-plane of single cable tower. Its span is 114+120 m and a whole length of 236 m.
The relationship among reserve ration, government spending and economic growth was analyzed. A monetary endogenous growth model is well developed by taking into
A network structure of coalmine integrated automation system based on NetLinx was proposed. The features of three-layer-network structure were discussed in deta