论文部分内容阅读
在地铁车站施工中,如何科学的处理地面交通是对决策造成影响的一个重要因素。在施工过程中,经常会遇到明挖法达不到施工要求,暗挖法成本过高的情况,此时可以使用盖挖逆作法施工则是非常明智的。本文以实际工程为例,对盖挖逆作法的施工优点进行了介绍,然后对车站盖挖逆作法关键性施工技术进行了介绍,具有一定的借鉴参考价值。
How to handle ground transportation scientifically is an important factor that affects decision-making in the construction of subway station. In the course of construction, it often happens that the method of digging method can not meet the construction requirements and the cost of undercutting method is too high. At this time, it is very wise to use the method of cover digging and reverse construction. In this paper, the actual project is taken as an example to introduce the advantages and disadvantages of the construction method of cover dug reverse method, and then the key construction technology of the cover dug reverse method is introduced, which has certain reference value.