论文部分内容阅读
在整个陆浑水库工程管理区范围内,通过几辈陆浑人的辛勤工作,到今天,整个工程区的面貌发生了巨大的变化,最为明显的变化表现在坝区防汛道路变宽了、变平了、进出水库的通道口变多了、出入便利快捷了,道路的日常维护和检查也成为防汛工作中很重要一部分,随着近几年极端天气发生概率的增加,在防汛道路上发生因温度因素引起的膨胀拱起破坏现象逐步增多。以下是对2009年6月24日(当月极端气温)发生的防汛道路因温度因素引起的膨胀拱起破坏现象初步探讨和分析。
Throughout the entire Luhun Reservoir Project Management Area, through the hard work of several generations of Luhun people, the appearance of the whole project area has undergone tremendous changes to the present day. The most obvious change is that the flood control roads in the dam area have become wider, Flat, out of the reservoir channel openings more convenient and quick access, the road routine maintenance and inspection has also become an important part of flood control work, with the increase in the probability of extreme weather in recent years, occurred in flood control roads due to Temperature expansion caused by the expansion arched destruction gradually increased. The following is on June 24, 2009 (the extreme temperature of the month) flood control roads due to temperature expansion caused by arching destruction of the initial discussion and analysis.