本文通过浙江76省道复线南延至大麦屿工程漩门湾三桥水中主墩承台施工为实例,简要叙述桥梁高桩承台钢吊箱法施工中混凝土底板的设计、施工工艺及成本情况。
In this paper, the construction of the main pier of Xuanmen Bay Third Bridge in South Extension to Damayu Bay Project of Zhejiang Provincial Highway 76 is taken as an example. The design, construction technology and cost of the concrete floor in the process of construction of the bridge pile piling steel box are briefly described.