1 工程概况小浪底水利枢纽工程是一座以防洪、防凌、减淤为主,兼顾发电、灌溉、供水等综合利用的水利枢纽工程,枢纽由大坝、泄洪排沙建筑物、水电站等组成。枢纽规模大、洞室多、地质水文泥沙条件复杂,且工程下游紧邻陇海、焦枝、京广三大铁路动脉以及广大的黄淮海平原,其安全运行与否,不仅关系到工程自身的安危,也直接关系到黄河下游亿万人民生命财产的安全。因此,
1 Project Overview Xiaolangdi Hydro Project is a water control project that focuses on flood control, anti-flood and siltation reduction, taking into account the comprehensive utilization of power generation, irrigation and water supply. The project consists of dams, flood discharge and sediment discharge structures and hydropower stations. The hub has large scale, many caverns and complex geological, hydrological and sediment conditions. The downstream of the project is close to the Longhai, Jiaozhi and Jingguang railway lines and the vast Huang-Huai-Hai Plain. The safe operation or not is not only related to the project itself It is also directly related to the safety of the lives and property of hundreds of millions of people in the lower reaches of the Yellow River. therefore,