1 工程概况扩大拦路港、疏浚泖河斜塘工程(简称拦路港工程)是太湖流域综合治理十大工程之一。该工程位于上海市青浦区、松江区境内,北起淀山湖出口的淀峰村,南接东泖河直至斜塘出口至黄浦江,河道全长23.6km,其中拦路港长8.9km,泖河长8.5km,斜塘长6.2km,并作为国家计委批复的苏申外港线四级航道的组成部分。
1 Overview of the Project Expanding the port of quarantine and dredging the Taohe River Xie Tong Project (referred to as the “Stopping Harbor Project”) is one of the ten major projects in the comprehensive management of the Taihu Lake Basin. The project is located in the Qingpu District of Shanghai, Songjiang District, the territory of Dianfeng Lake in the north exit of the village, south of Dongbian River until the inclined pond exit to the Huangpu River, the river length of 23.6km, of which 8.9km long blocking road, long river 8.5km, Xie Tong 6.2km long, and as part of the Grade 4 waterway of Su Shen Line approved by the State Planning Commission.