长科院在改革试点中,科研成果喜人。据最近统计:1984年完成工程实验项目422项,提出成果报告187份,并有多项成果获奖。长科院为紧密配合长江三峡、葛洲坝等水利枢纽工程的设计,在去年广泛开展了协作攻关,进行了水力学、河流学、地质力学、岩石力学、土力学、材料结构、爆破振动、物理化学及水工仪器等实验研究.全院六百余名科技人员日日夜夜不辞劳苦地忘我劳动,通过调查观测,分析计算及模型实验,取得了论证三峡工程可行性报告和初步设计的重要成果,为解决三峡工程大坝的泄洪、泥沙、坝基稳定、枢纽布置等问题作出了贡献。在这些成果中,有的取得了新的突破。最近水电部科技司在文件简报中写到,长科院在地质力学模型材料,及试验技术研究方面有了较大的突破,在应用上除广泛用于坝基、拱坝坝肩稳定分析和加固措
Long Branch in the pilot reform, scientific research gratifying. According to recent statistics, in 1984, 422 engineering experiment projects were completed, 187 results reports were submitted and many achievements were awarded. In order to coordinate closely with the design of the Three Gorges Project and Gezhouba Hydropower Project, the Long ASTRI conducted a wide range of collaborative research projects last year, including hydraulics, river science, geomechanics, rock mechanics, soil mechanics, material structure, blasting vibration, physical chemistry And hydraulic instruments and other experimental research.A whole hospital more than 600 scientific and technical personnel day and night to work tirelessly selfless labor, obtained through the investigation and observation, analysis and calculation and model experiments, feasibility studies have been demonstrated Three Gorges Project and the preliminary design of the important results , In order to solve the Three Gorges Dam flood discharge, sediment, dam foundation stability, hub layout and other issues made a contribution. Among these achievements, some have made new breakthroughs. Recently, the Ministry of Science and Technology of the Ministry of Water Resources wrote in a document briefing that the Chinese Academy of Sciences has made great breakthroughs in geomechanical modeling materials and experimental technology research. In addition to being widely used in the application, the institute has been widely used in the stability analysis and reinforcement of dam abutments and arch dam abutments Measures