论文部分内容阅读
简介了某初轧厂13.5t钢锭扎成230mm方坯的原有压下规程,提出了进行压下规程优化设计的指导思想及其原则,并制定了新的优化压下规程。
This paper introduces the original rolling schedule of a 13.5 t steel ingot rolled into a 230 mm billet in a preliminary rolling mill, puts forward the guiding principle and its principles for optimal design of the rolling schedule, and formulates a new optimized rolling schedule.