水布垭水利枢纽位于清江干流中游河段 ,是清江恩施以下河段开发的龙头水库。坝址集水面积 1 0 80 6 km2 ,占全流域的 6 4%。水库正常蓄水位 40 0 m,死水位 35 0 m;水库总库容 45 .80亿 m3,其中调节库容 2 3.83亿m3,库容系数 2 5 .3% ,具有多年调节性能 ;水电站装机容量 1 6 0 0
Shuibuya Water Control Project is located in the middle reach of the Qingjiang River and is the leading reservoir for the development of the following reach of Enshi. The water catchment area of the dam is 1 0 80 6 km2, accounting for 64% of the whole basin. The reservoir has a normal water level of 40 0 m and a stagnant water level of 35 0 m. The reservoir has a total storage capacity of 458 million m3, of which 283 million m3 is regulated and 25.5% of which is a reservoir capacity with a multi-year regulatory capacity. The installed capacity of hydropower stations is 16 0 0