论文部分内容阅读
东北水利水电开发总公司总承包山口水利枢纽土建工程,开工四年多的实践,采用了较多先进技术,积累了一定的勘测、设计、采购、施工等全过程总承包管理经验,培养了一批既懂业务又会经营管理的专业人才。该工程于1999年12月18日正式并网发电以来,至今运行正常,并取得了比同类工程节省约10%的较大的经济效益及社会效益,实现了建设工程“三大控制”的最优预期效果。经业主多次综合检查及水利部组织的两次工程检查,综合评价为优。充分体现了我国大力推广的以设计为主体的工程总承包的优越性。
Northeast Water Conservancy and Hydropower Development Corporation General contracting Shanhayen water conservancy hub civil engineering, started more than four years of practice, using more advanced technology, has accumulated some survey, design, procurement, construction and other general contracting management experience, training a The batch of professionals who know both business and management. Since the project was formally connected to the grid on December 18, 1999, the project has operated normally and achieved relatively large economic and social benefits of saving about 10% more than similar projects. The project has achieved “three major control” The best expected results. The owners of multiple comprehensive inspection and the Ministry of Water Resources organized two engineering inspections, comprehensive evaluation as excellent. Fully reflects our country to promote the design as the main project of the general contracting superiority.