移动通信工程的对外协调工作贯穿整个建设施工的全过程,从选址签约、土建施工、铁塔安装、线路接入、市电引入、设备安装到维护运行各个环节都离不开协调。另外,由于各个环节具有的连贯性,上一环节没有协调到位,往往会影响下一环节的顺利实施,因此做好对外协调工作对施工生产顺利进行至关重要。协调工作要做好预案、主动出击在基站选址和线路路由设计上要提前制订方案,尽量远离人口密集、周
External coordination of mobile communications projects throughout the entire construction process from the signing of the site selection, civil construction, tower installation, access lines, electricity introduction, equipment installation and maintenance operations can not be separated from all aspects of coordination. In addition, due to the consistency of all links, the coordination of the previous session is not in place and will often affect the smooth implementation of the next session. Therefore, it is of utmost importance to do a good job in coordinating external work smoothly with construction and production. Coordination work to make plans, take the initiative in the base station site routing and route design to advance the development plan, as far as possible away from the densely populated, weeks