结合工作实际,指出编制施工方案的考虑因素。分析行车条件、电务设备条件和工务点内工作量之间的相互制约条件。指出工务施工中点内工作量的大小都可以用相应的劳力数量来解决的错误观念,以及劳力使用不均衡带来的经济亏损。提出信号专业在既有设备上进行一部分过渡施工对降低项目整体成本是有利的。
Combined with the actual work, pointed out that the preparation of the construction program considerations. Analysis of traffic conditions, the conditions of the electrical equipment and the workload within the work point of the mutual constraints. It is pointed out that the amount of work in the mid-point of construction can be corrected by the corresponding amount of labor, and the economic loss caused by unbalanced use of labor. It is advantageous to suggest that a part of the transitional construction of signaling professionals on existing equipment will reduce the overall project cost.