论文部分内容阅读
渡市选煤厂设计年处理原煤能力45万吨,1982年投产。原设计煤泥水流程如图1。
At the design of Dutiable Coal Preparation Plant, the annual capacity of raw coal was 450,000 tons and put into operation in 1982. The original design slime water process shown in Figure 1.