1.现状与问题 转炉分厂现有三座8t氧气顶吹转炉,配吹氩喂丝机和一台R6m三机三流德马克型的小方坯连铸机。以及浇注267mm×267mm钢锭的地坪模注和其它辅助设施。95年主要技术经济指标如表1示。
1. Status Quo and Problems The converter plant currently has three 8-ton oxygen top-blown converters equipped with an argon purging wire feeding machine and a R6m triple-flow Decker-type billet caster. As well as casting 267mm × 267mm ingot floor molding and other ancillary facilities. 95 major technical and economic indicators shown in Table 1.