论文部分内容阅读
經过无产阶級文化大革命锻鍊的五营二十二连的全体干部和战士,遵循毛主席关于“自力更生,艰苦奋斗,破除迷信,解放思想”的教导,在接受×桥1孔64米栓焊梁拖拉架設任务的施工过程中,高举《鞍鋼宪法》的光輝旗帜,坚持两参一改三結合的道路,群策群力,对原施工設計进行了反复討論研究,結合工地进料情况及現有的机具設备,坚持土法上馬,开展群众性技朮革新活动,从而保証了貭量又提前了工期,茲将初步总結的情况介紹于后。一、施工布置图(见图1)
Following the teachings of Chairman Mao on “self-reliance, hard work, breaking superstition and emancipating the mind”, all cadres and soldiers of the 22nd Battalion of the Wuying Battalion, led by the Great Proletarian Cultural Revolution, During the construction of the welding beam hauling erection task, holding the glorious banner of “Anshan Iron and Steel” constitution, insisting on the road of combining the two senses and changing one of the three to make concerted efforts, the author conducted repeated discussion and research on the original construction design. Combining the feed situation of the site and the existing equipment Equipment, adhere to the local law, to carry out mass technological innovation activities, thus ensuring the quantity and advance the deadline, it is the first summary of the situation introduced later. First, the construction layout (see Figure 1)