论文部分内容阅读
本文研究河流主航道上大型水利枢纽的发电-航运优化日运行方式,提出决规划阶段问题和运行阶段问题的两个数学模型及其求解方法。以长江三峡-葛洲坝梯级水电站为实例进行了计算,得出初步结果。
This paper studies the power generation-shipping optimization day operation mode of large-scale water conservancy hubs in the main waterway of the river and proposes two mathematical models and solutions to the problem of planning and operation phases. Taking the Three Gorges-Gezhouba cascade hydropower station as an example, the preliminary results are obtained.