鲁电视台播控机房的建设是在93年初 ,同年开始正常的启用。那时省一套节目的播出任务是由一、二分控机房来完成的 ,因此 ,现在的齐鲁机房也被称为三分控播出机房。为便于播出机房的统一性管理 ,三个机房的基本建设思路是一致的 ,只是为确保播出的安全和准确性 ,本机房设计增
Lu television broadcast control room construction is in early 1993, the same year the normal opening. At that time, a broadcast program in the province was completed by one or two control room. Therefore, the current Qilu computer room was also called the third control room. In order to facilitate the unity of broadcast room management, the three basic ideas of the engine room is the same, just to ensure the safety and accuracy of broadcast, the room designed to increase