论文部分内容阅读
2013年,全院核安全情况如下:在役核设施安全运行,未发生上等级核与辐射事件;在建核设施进展有序;核材料处于严密监管之下,未发生丢失与被盗事件。1在役核设施101堆目前处于安全停闭期,严格按照《重水研究堆安全关闭期运行维护、监测规程》和有关规程的规定,进行反应堆系统、设备的维护和监测工作,日常加强重水储存间的巡视、检查,防止重水泄漏异常事件的发生。定期对含氚废水罐进行巡视、检查,并开展环境跟踪监测,6月20日
In 2013, the nuclear safety of the hospital was as follows: The nuclear facilities in operation were in safe operation with no top grade nuclear and radiation incidents; the nuclear facilities under construction were in an orderly progress; nuclear materials were under strict supervision and no loss or theft occurred. 1 The 101 nuclear reactor in operation is currently under safe shutdown and the maintenance and monitoring of the reactor system and equipment are carried out in strict accordance with the provisions of Operation, Maintenance and Monitoring Procedures for the Safety Shut-off Period of Heavy Water Research Reactor and the relevant rules and regulations, and the routine enhancement of heavy water storage Between the inspection, inspection, to prevent the occurrence of abnormal heavy water leakage. Regular inspection of tritium-containing waste water tanks, inspection, and carry out environmental monitoring, June 20