汶川灾后重建过程中余震不断,新浇筑的混凝土结构受余震作用后钢筋产生甩动、构件出现微裂缝等现象,这些现象是否会影响钢筋与混凝土间的握裹力,是重建项目所面临的问题之一。对早龄期钢筋混凝土试件施以不同峰值加速度的振动力后即时进行拉拔试验,分析不同振动力对不同龄期的混凝土钢筋握裹力的影响。结果表明:早龄期混凝土在12h(初凝至终凝间)受振动作用,对钢筋握裹力影响最大,即时可产生13.86%的折损;而2d以上龄期的混凝土受振动作用,其钢筋握裹力折减率最大仅为4.69%。
After the Wenchuan earthquake reconstruction aftershocks continued, the new pouring of concrete structures by the aftershocks after the rebar produced shaking, micro-cracks and other components appear, whether these phenomena will affect the steel and concrete between the binding force is the reconstruction of the problems facing the project one. The prestressed concrete specimens with different peak accelerations were subjected to the pullout test immediately, and the influence of different vibration forces on the concrete-bound strength of the concrete rebars at different ages was analyzed. The results show that the concrete in the early age is subject to the vibrational effect at 12h (initial to final solidification), which has the greatest impact on the reinforcement of the steel bar, with an instantaneous loss of 13.86%. However, the concrete with the age of 2d is subject to vibration, Retention rate of rebar maximum reduction of only 4.69%.