某变电站滑坡位于金沙江右岸的斜坡上。滑坡纵长70米,横宽120米,滑面最大深度20.8米。该滑坡发生于1976年,在1978年雨季后有所发展。整治前,滑坡处于蠕动挤压阶段,已危及变电站安全。一旦发生较大的滑动,将造成变电站倒塌,进而牵引古滑坡后缘,甚至波及冷冻厂生活区。该滑坡有两个特点:第一,它位于古滑体上,古滑面较深;第二,整治前它处于蠕动挤压阶段,滑体周界不清,新滑面尚未完
A substation landslide is located on the slope of the right bank of the Jinsha River. The landslide is 70 meters long and 120 meters wide. The maximum depth of the sliding surface is 20.8 meters. The landslide occurred in 1976 and developed after the 1978 rainy season. Prior to remediation, landslides were in a peristaltic compression stage, which has jeopardized the safety of substations. Once a large slippage occurs, the substation will collapse and the trailing edge of the ancient landslide will be towed, even affecting the living quarters of the refrigeration plant. The landslide has two characteristics: first, it is located on the ancient landslide, and the ancient slippery surface is deep; second, it is in a peristaltic compression stage before the remediation; the perimeter of the slide body is unclear and the new slip surface is not yet finished.