1986年3月安装在重水反应堆旁冷中子源制冷系统重新调试运行,各项性能都达到设计要求。1987年2月在冷包真空抗爆管加热至温度100℃对模拟冷包进行测温试验,在制冷系统停机工况下,模拟冷包温度为147℃。1985年12月完成冷中子源与中子导管之间的开关门、侧面和顶部屏蔽体的设计、冷中子源与开关门之间冷中子导管的设计。1986年6月完成可移动屏蔽体轨道的设计,
March 1986 installed in the heavy water reactor next to the cold source neutron source refrigeration system re-commissioning operation, the performance has reached the design requirements. In February 1987, the cold burst vacuum explosion-proof tube was heated to a temperature of 100 ° C to test the simulated cold package temperature. Under the shutdown condition of the refrigeration system, the simulated cold package temperature was 147 ° C. December 1985 to complete the cold neutron source and neutron duct between the opening and closing doors, side and top of the shield design, cold neutron source and switch between the cold-opening of the catheter design. June 1986 to complete the design of mobile shield track,