论文部分内容阅读
斯维尔特洛夫省索特林森工局的合理化建议者实行了一种快速木材装卸车法,该法使用 TЛ-3型绞盘机和 A 型架杆将木材装上车廂或从汽车上卸下原条。绞盘机装设于每个装卸台的旁边。造材台(1)由原条架设而成,宽10米,长25—30米,高出地面1—1.2米,台上固定有两根装車钢索(2),其自由活动的两端连接有铁环(3),每根卸车钢索的长度为30—35米,直径为22毫米。原条卸车的过程是这样的:载着原条的汽车(4)停在装卸台的对面,在汽车和卸车台之间架起轻便的爬杆(5),卸车钢索抓起原条。装车工暂时停止装车,摘去吊索(6),并将卸车钢索通过连接环(3)固定在绞盘机上的装車钢索上。借助装车绞盘机(8),
Rationalization of Sotlingham Council offices in Sverdlov Province introduced a fast timber loading and unloading law, which used T-3 winches and A-frame bars to load or unload wood onto the car Remove the original article. Winch machine installed in each loading and unloading station beside. (1) Erected from the original strip, width 10 meters, 25-30 meters long, 1-1.2 meters above the ground, fixed on the stage two loading rope (2), its free-moving two End connected to the hoops (3), each dump truck length of 30-35 meters, a diameter of 22 mm. The original bar unloading process is this: the car carrying the original (4) parked opposite the loading and unloading station, set up between the car and the dump truck light poles (5), unloading cable grabbed the original article. The loader stops the loading for a while, picks the slings (6), and secures the unloader ropes through the connecting ring (3) to the loading ropes on the winch. With the loading winch machine (8),