论文部分内容阅读
平顶山局六矿是设计年产量90万t的大型矿井,经技术改造现已达130万t。自1970年投产以来,矿领导都十分重视煤炭资源的开发与管理工作,把回采率作为煤矿主要经济技术考核指标。特别是自1986年颁布《矿产资源法》以来,矿领导把回采率计划列入了年计划,在考虑引进技术与设备的同时考虑资源的合理利用,根据煤层的赋存状况考虑设备的选型及开采方法。在管理上,总工、地测科、生产技术科、总办室(设计)、采掘队等对资源回收责任明确,并建立了一系列的资源监督与管理制度。
Pingdingshan Bureau six mines are designed to produce 900,000 t annual output of large-scale mines, the technological transformation has now reached 1.3 million t. Since put into production in 1970, mine leaders have attached great importance to the development and management of coal resources, taking the recovery rate as the main economic and technological evaluation index of coal mines. Especially since the promulgation of the “Mineral Resources Law” in 1986, mine leaders have included the recovery rate plan in the annual plan. They should consider the rational utilization of resources while considering the introduction of technology and equipment, and consider the selection of equipment according to the occurrence of coal seams And mining methods. In management, the chief engineer, geoscience department, production technology department, general office (design), mining team and other responsibilities for resource recovery clear, and established a series of resource supervision and management system.