论文部分内容阅读
在无产阶级文化大革命的推动下,我厂“三结合”小组在1966年开始,设计两吨操纵机,并于1968年试制成功用于生产。随着使用经验的积累,操纵机的使用范围也不断在扩大。在总结这台操纵机的基础上,又学习了国内外较先进的结构,于1971年和1974年,0.5吨和5吨四连杆有轨混合驱动的两台操纵机又先后正式用于生产。“三结合”小组在毛主席革命路线指引下,勇于实践,参加了设计、制造、安装、调试、使用和维修的全过程,对操纵机也经历了由不认识到有了认识不断深化
Driven by the Great Proletarian Cultural Revolution, the “Three Combined” group of our factory started in 1966 with the design of two tons of manipulators and was successfully piloted in 1968 for production. With the accumulation of experience, the use of control machines are also constantly expanding. On the basis of summarizing this manipulator, we also studied the more advanced structures both at home and abroad. In 1971 and 1974, two manipulators with 0.5-ton and 5-ton four-bar rail hybrid drives were formally used in the production . Under the guidance of Chairman Mao’s revolutionary line, the “three combined” team has taken the courage to practice and took part in the entire process of design, manufacture, installation, commissioning, use and maintenance, and has gone through the process of disregarding the understanding and understanding of the manipulator