人类向沙漠挑战的又一重大成果 “死亡之海”缚黄龙

来源 :科学新闻 | 被引量 : 0次 | 上传用户:zhifeiji1
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
2001年3月8日,由中国科学院新疆分院主持,对中国石油天然气股份有限公司塔里木油田分公司和中国科学院新疆生态与地理研究所共同完成的“塔中油田和沙漠公路沙害防治与生态环境建设技术研究与示范”项目进行了鉴定。该项目启动于1994年,系配合沙漠腹地油田基地和沙漠公路建设,为改善环境而进行的防沙绿化先导试验,在“九五”期间正式纳入中国石油天然气总公司的攻关计划内,通过近7年的试验,项目组提出了沙漠 March 8, 2001, chaired by the Xinjiang Branch of the Chinese Academy of Sciences, the China National Petroleum Corporation Tarim Oilfield Branch and the Chinese Academy of Sciences, Xinjiang Institute of Ecology and Geography, jointly completed the “tower of oil fields and desert highway sand control and ecology Environmental Construction Technology Research and Demonstration ”project was identified. The project was started in 1994 and is a pioneer experiment of preventing desertification and greening with the construction of oilfield base and desert highway in the hinterland of the desert. It was officially included in the research program of CNPC during the “95” period, After nearly seven years of experiment, the project team proposed the desert
其他文献
珠江三角洲河网水系纵横交错,相互贯通,由于它的特殊地貌特征,使得它具有牵一发而动全身的特点。围垦一个口门,一片滩地都有可能造成大面积的环境变化,牵连的范围很广。从前
一、八郎泻围垦工程二次大战后,日本粮食紧缺,国土又小,为解燃眉之急,内海和湖泊围垦自然引起关注。国家于1944年11月,1947年,1949年先后制定了“紧急开拓实施要领”、“开
本文介绍的新式差动调压室如图1所示,文中涉及的符号说明如后:H_(i_(t))”为第i点t时刻的水头;q_(i_(t))为第i管口断面t时刻的流量;f_0为阻抗孔口面积;f_4为外室环形面积;H_
太平湾水电站水轮机型号为ZZ5604—LH—800,发电机型号SF47.5—88/12640,哈尔滨电机厂设计制造。发电机推力轴承为液压支柱式、推力瓦为12块薄瓦结构,镜板直径φ2900mm,推力
卫河,为曹魏时期的白沟漕道,隋之永济渠(亦称御河)。至明代改称卫河,因源出于卫地得名。武王灭纣后,把殷地封纣子武庚,后武庚叛,兵败被杀,周公之弟康叔 Wei River, Baigou
铜街子水电站位于四川省乐山市沙湾区附近,系大渡河梯级开发中最后一个梯级。坝址距上游已建成的龚嘴水电站33km。成昆铁路在本电站下游约17km处之轸溪车站通过,公路至乐山
黄河是我国的第二大河流,它的洪水灾害,史不绝书。而成灾洪水主要来源于干流河口镇以下至花园口之间的中游地区。本文拟对这一地区发生的最大洪峰流量特性进行一概略分析,以
本文运用极限分析和数学规划方法,研究拱坝所能承担的极限荷载。坝肩岩体稳定通常被认为是拱坝安全的重要条件。本文所提出的分析计算将结合岩体稳定条件定量算出拱坝的极限
本文得出了边界层中近底的层流区,过渡区和对数区的连续流速分布,适用于光滑表面、粗糙表面和减阻流体。这一结果是根据均匀流运动方程和边界层紊流区涡流粘滞度按抛物线分布
红外测距仪和其它测绘仪器一样,在使用过程中,均应对仪器的性能和精度进行定期检测,以确保作业精度。一台新出厂的仪器,工厂虽提供了标称精度,由于厂家制造工艺的差异,产品