浙江省乌溪江水电厂梯级集中控制计算机监控系统经过整整一年的紧张工作,于1999年5月1日前夕完成全部系统设备的安装调度,投入试运行。该系统由湖南镇电站计算机监控系统,黄坛口电站计算机监控系统及梯级调度中心计算机监控系统组成,硬件选用了先进的 Alpha500au 工作站和光纤构成的100 MB 快速以太网主干网,是目
Zhejiang WuXiJiang cascade centralized control computer monitoring system after a year of intense work on the eve of May 1, 1999 to complete the installation of all system equipment scheduling, put into trial operation. The system consists of computer monitoring system of Hunan Power Station, computer monitoring system of Huangtankou power station and computer monitoring system of cascade dispatching center. The hardware selects advanced 100M Fast Ethernet backbone composed of Alpha500au workstation and optical fiber