【摘 要】
:
在班级管理中,班主任作为班集体的组织者、教育者、指导者,是学校领导实施教育、教学工作的得力助手,也是班级管理的实际领导者。为了适应当今瞬息万变的社会发展及多变的教
论文部分内容阅读
在班级管理中,班主任作为班集体的组织者、教育者、指导者,是学校领导实施教育、教学工作的得力助手,也是班级管理的实际领导者。为了适应当今瞬息万变的社会发展及多变的教育形势,做“永葆青春”的班主任,教师在班集体建设中要不断更新教育观念,与时俱进,转变教学态度,改进教学方法,努力转换好自己的角色,给自己定好位。
In class management, the teacher in charge of class as the organizer, educator and mentor of class collective is the right-hand man for school leadership to carry out education and teaching work as well as the actual leader of class management. In order to adapt to the ever-changing social development and changing education situation of today and to be the class teacher who always stays young, teachers should constantly update their educational concepts, keep pace with the times, change teaching attitude, improve teaching methods, Try to change your role and set yourself a good place.
其他文献
去年夏天,南昌媒体连出了两期广告:“您愿意上钩吗?”“您愿意上贼船吗?”广告在《销售与市场》后面一堆花花绿绿的广告丛中一刊出,立即招来全国各地不断的电话。为什么能在
脉冲泵浦条件下EDFA特性的研究具有重要价值,因此需要高性能的脉冲泵浦激光器。介绍了以iC-HG为核心芯片设计980nm脉冲激光器的驱动电路,同时以DRV591为核心芯片设计脉冲激光
团结协作求实发展──全国渠库防渗科技协调组及信息网一九九五年工作回顾一九九五年,本同在水利部及信息所的领导下,在正(副)网长单位及领导组的组织下,在全体网员单位的共同努力
进入下半年以来,中国客厅影院产业联盟加快了搭建交流平台,聚集联盟内外资源,整合各方合作意向,力促市场快速发展。9月6日晚上,2017中国客厅影院产业联盟交流活动(上海站)在
北江白石窑水电站二期截流成功北江白石窑水电站位于北江干流的中部,地处英德市望埠镇蒋家洲村,是北江干流韶关以下的第三个水电梯级,上距曲江县蒙里水电站约43km,下距英德市城区25km,电站
位于西藏山南地区桑日具境内的沃卡河一级水电站,海拔3700m左右,1996年4月20日在工地举行了奠基仪式,标志着该工程的施工准备工作开始进行.该工程主要为满足羊卓雍湖抽水蓄能电站
三峡水库蓄水前秭归县电力设施改建与发展谭云岭(湖北省秭归县水利电力局443600)1归县电力建设现状林归县地处鄂西深山区,三峡坝址上游。全县总面积2427km2,耕地面积2.71万hm2。全县辖16个乡镇,467个村,122015户,43.8万人
“八五”全国农村饮水、乡镇供水工作再上新台阶“八五”期间,在党中央和国务院的关怀下,在水利部党组的领导下,经过各级水利部门和广大群众的共同努力,农村饮水、乡镇供水工作迈
《文汇报》连续刊出了杜邦广告,虽然只是二、三种画面的不断切换,但我发现有许多人对它还是较为喜爱的,没有那种一看即翻、一见即扔的厌烦情绪出现。就这样连续几日地阅览下
禅说:“扬起一微尘,大地就在其中。”在这个奇妙的世界里,每一片树叶都包藏着整个宇宙的真相,正所谓“一沙一世界,一叶一如来”。创意人不得不承认,每一粒沙子都是一个无限