介绍了利用常规设备实现渝怀线沙坝隧道快速施工的做法 ,认为实现隧道快速施工主要在于设备的合理配置和科学的组织与管理 ,提出设备配置不仅是设备的先进性和稳定性 ,更主要的是配置的合理性 ;管理上要组建精干高效的管理机构和作业中心 ,将管理的力量主要放在施工现场 ,突出协调各种控制循环时间和确保工程质量、机械和物资的供应 ,施工安全等
Introduced the use of conventional equipment Yuzhuang Shaba tunnel to achieve rapid construction practices, that the realization of rapid construction of the tunnel lies mainly in the rational allocation of equipment and scientific organization and management, proposed equipment configuration is not only the advanced equipment and stability, more important Is to configure the rationality; management to build capable and efficient management agencies and operations center, the management of the power mainly on the construction site, highlighting the coordination of various control cycle time and ensure the quality of the project, the supply of machinery and supplies, construction safety Wait