论文部分内容阅读
葛洲坝水利枢纽工程是长江上第一座水利枢纽工程,是我国自行研究、设计、建设而成的大型水电站,北抵江北镇镜山,南接江南狮子包,主要由船闸、电站厂房、泄水闸、冲沙闸及挡水建筑物组成。大坝全长2595米,坝顶高70米,宽30米,雄伟高大,气势非凡。葛洲坝水利枢纽工程建设耗时18年,于1970年12月30日开始动工,1981年第一期工程完工,实现了大江截流、蓄水、通航和二江电站第一台机组发电;1982年第二期工程开始,1988年
Gezhouba Hydro Project is the first water control project on the Yangtze River, China’s own research, design and construction of large-scale hydropower station, north of Jiangbei Town, Jingshan, South Lion pack south, mainly by the lock, power plant, sluice , Red sand gate and retaining structures. The dam is 2595 meters in length, with a height of 70 meters and a width of 30 meters. It is majestic and magnificent with extraordinary momentum. The construction of Gezhouba Project took 18 years and started on December 30, 1970. The first phase project was completed in 1981, realizing the closure of the major rivers, water storage, navigation and the first generating unit of Erjiang Hydropower Station. In 1982, The second phase started in 1988