论文部分内容阅读
马鞍山矿山研究院、本钢歪头山铁矿和本钢公司矿山处合作,为提高尾矿输送浓度,在4号浓缩池上进行计算机恒量控制系统的单机试验研究获得成功的基础上,于1988年10月将该项目进一步延伸,开展尾矿流量计算机集中控制与优化管理系统的研究,于1989年9月完成了全部试验,投入了生产运行。该系统主要是应用计算机过程控制技术与系统工程技术,对歪头山铁矿现有的8台尾矿
Maanshan Mining Research Institute, Benxi Iron and Steel Waituoshan Iron and Bengang Iron and Steel Company Mine Department, in order to increase the tailings transport concentration, in the No. 4 thickener on the computer constant control system of stand-alone experimental study on the basis of success, in 1988 In October, the project was further extended to carry out research on centralized control and optimization of tailings flow computer system. All tests were completed in September 1989 and put into operation. The system is mainly the application of computer process control technology and system engineering technology, the Waituanshan iron mine existing 8 tailings