一些施工单位在框架施工中.往往忽视柱筋搭接部分即出柱模部分位置的确定,仅用一只箍筋绑在顶部,有的连这只箍筋也不绑,浇捣混凝土时,绝大部分钢筋松脱、变形,导致搭接钢筋位移严重,直接影响工程质量。我单位在框架结构施工中,采用φ12的圆钢,焊成一个工具式卡箍,见图1,内面根据主筋数量、位置,用φ6钢筋弯成半圆形,焊在卡箍上。卡箍净空尺寸应比设计的箍筋尺寸缩小一个主筋直径,以
Some construction units in the construction of the frame often ignore the determination of the position of the column molds, which is the overlapping part of the column bars. Only one stirrup is tied at the top, and some of the stirrups are not tied and the concrete is poured. Most of the steel bars loosen and deformed, resulting in serious displacement of lapped steel bars and directly affecting project quality. In the construction of the frame structure, our company uses φ12 round steel, welded into a tool-type clamp, see Figure 1, according to the number and position of the main rib, the inner surface is φ6 steel recurved into a semicircle, welded on the clamp. The headroom clearance of the clamp should be reduced by one main rib diameter compared to the design of the stirrup size.