论文部分内容阅读
文章通过对增隆昌水库除险加固工程实例的分析,针对其存在的主要地质问题,提出相应的防渗处理方案,并将处理前后观测井水位进行对比,得出坝基、坝肩防渗处理效果良好的结论。
Based on the analysis of Zenglongchang Reservoir Reinforcement Project, according to the main geological problems, this paper puts forward the corresponding solutions for seepage control and compares the observation wells’ water levels before and after the treatment to obtain the effect of seepage control of the dam foundation and abutment Good conclusion.