2010年7月,义海能源大煤沟煤矿采区工作面需要安装1部DSJ120/100/2×160型带式输送机,配移机尾。原DSJ120带式输送机移机尾在该矿的实际使用中存在结构复杂、体积大、安装不方便及固定不可靠等问题,需要对移机尾重新设计。根据该矿的要求和井下实际情况,结合带式输送机类似案例的技术状况,对DSJ120/100/2×160型带式输送机移机尾进行了改进,并应用于实际生产中,取得了满意的效果。
In July 2010, the DSG120 / 100/2 × 160 belt conveyor needs to be installed on the face of the Daitou Mine in Yihai Energy. The original DSJ120 belt conveyor shift tail in the actual use of the mine there are complex, bulky, inconvenient installation and fixed unreliability and other issues, the need to re-tail the shift tail. According to the requirements of the mine and the actual conditions in the mine, the DSJ120 / 100/2 × 160 type belt conveyor tail was improved in combination with the technical conditions of similar cases of the belt conveyor and used in actual production, Satisfactory results.