论文部分内容阅读
本文介绍了主机厂抽水蓄能电站机组现场整体调试国产化的历程,结合国内抽水蓄能电站,对主机厂机组现场整体调试国产化的发展进行了分析和总结,并提出了相关建议。
This paper introduces the whole process of localization and commissioning of the unit of the Zhuji Pumped Storage Power Station, analyzes and summarizes the overall commissioning and localization development of the unit of the Zhuji Plant based on the domestic pumped storage power station, and puts forward some suggestions.