论文部分内容阅读
中国音乐学院职工住宅楼工程,为全现浇钢筋混凝土剪力墙结构,建筑面积为28625m~2,地上20层,地下2层,出屋面2层,层高2.9m。本工程的质量目标为结构被评为“长城杯”奖,因此,要求施工后混凝土表面
China Conservatory of Music workers residential building project, all cast-in-place reinforced concrete shear wall structure, construction area of 28625m ~ 2, 20 floors above ground, 2 underground, 2 out of the roof, storey height 2.9m. The quality of the project for the structure was named “Great Wall Cup” award, therefore, requires the construction of concrete surface